Hoop House Designer.
Hoop House and High Tunnel
Bows, bow length, peak height, tubing, and the snow and wind a tunnel has to stand.
A high tunnel is a walk-in hoop or gothic frame covered with plastic, heated only by the sun and vented by rolling up its sides (UConn). Bartok at UConn spaces the bows no more than 4 feet apart, sizes the tubing to the width, and plans for snow: 3 inches of wet snow or 12 inches of dry adds about 5 pounds per square foot, so a 30 by 72 foot tunnel must carry about 10,800 pounds (Bartok, UConn). Low tunnels over a single bed use wire or conduit hoops 4 to 5 feet apart (New Mexico State; Oregon State).
How the calculation works
Bows. One bow at each end and one at every spacing between: the length divided by the spacing, rounded down, plus one (our arithmetic). Bartok at UConn notes that a 48 or 96 ft tunnel makes better use of the 100 ft sheets of plastic usually sold.
Height and bow length. A round high tunnel is about half as tall as it is wide: a 20 ft tunnel stands about 10 ft at the ridge (Nebraska Extension). Hoops set on straight sidewalls, typically 36 to 60 inches tall, give more room along the walls and suit roll-up sides (Nebraska Extension). For a hoop to the ground the tool draws the arch as a half circle, π × width ÷ 2 long (our geometry). Bows on sidewalls and gothic bows follow the maker’s profile, which is usually flatter or more pointed than a half circle, so for those the tool asks for the peak height and does not estimate the bow.
Snow. Bartok’s figure is about 5 lb per square foot for 3 inches of wet snow or 12 of dry, applied over the tunnel’s floor area: 5 × 30 × 72 = 10,800 lb. For other depths the tool scales his figure in proportion, which is our extension of it; heavy or drifting snow, and ice, can weigh more.
Wind. Bartok gives three figures for an 80 mph wind: about 16 lb per square foot on a wall (13,824 lb on a 12 ft by 72 ft side), an uplift on the roof of about 220 lb per linear foot, and about 300 lb that each post has to hold down. The tool applies them to your tunnel’s length and height. Snow it scales by depth, since weight rises with depth; for wind, UConn gives only the 80 mph figure, so the tool gives no figure for other speeds.
Building it to stand
- Bows. No more than 4 ft on center (UConn). Cornell finds 12- or 11-gauge arches 4 ft apart enough for most snow loads in New York, heavier steel than UConn’s 14-gauge minimum; Purdue’s Indiana High Tunnel Handbook suggests 14 gauge at least. With the same pipe, bows 4 ft apart are much stronger than bows 6 ft apart (Missouri). Nebraska notes that wider spacing needs larger tubing.
- Purlins and bracing. At least 3 purlins on tunnels under 26 ft wide and 5 on wider ones; cross ties, collar ties or trusses on tunnels wider than 26 ft; diagonal bracing at the four corners against racking (UConn). Some Vermont growers add trusses to every bow, and the growers stress strong, well-anchored end walls, often the weak point in wind (UVM).
- Posts and anchors. Ground posts driven 24 to 30 inches deep; in windy places, auger or screw anchors about 10 ft apart, or deadmen (UConn). Where snow or wind loads are high, anchor every second bow in a concrete footing at least 24 inches deep against frost heave (Missouri).
- Snow. Gothic roofs shed snow better than round ones, whose nearly flat ridge is their weakest point (Missouri; Cornell); Vermont growers aim for a 6:12 pitch, 26.6° (UVM). If the cover stays on in snow country, set 2 by 4 posts under the ridge at every third or fourth hoop (UConn). Leave room to clear snow between and around tunnels; NRCS suggests 10 to 20 ft between side-by-side tunnels.
- Ends. End-wall openings at least 6 by 6 ft for air and equipment (UConn).
Low and caterpillar tunnels
Low tunnels. New Mexico State bends 9- to 10-gauge galvanized wire 48 to 60 inches long into hoops spaced 4 to 5 ft apart. Oregon State’s strawberry trials used 6 to 8 ft hoops of galvanized conduit, wire or PVC, pushed at least 6 inches into the soil each side, 4 to 5 ft apart, with the top 2 to 3 ft above the mature crop, in rows up to 300 ft. Oregon State has not tested low tunnels for snow and uses 4 ft spacing where snow may fall. NRCS code 325 does not cover low tunnels.
Caterpillar tunnels. Smaller, lower-cost and less permanent: ropes hold the plastic down, giving the segmented look, and the light hoops give little structural support, so they are usually less than 14 ft wide (Purdue). No extension source we read gives a bow spacing for them.
The NRCS high tunnel standard and EQIP
NRCS supports high tunnels as conservation practice 325, High Tunnel System; the national standard is dated March 2015, and each state publishes its own version and payment rates. Among its criteria:
- Crops grown in the natural soil profile; raised beds up to 12 inches deep. Not for tables, benches, pots or hydroponics; not greenhouses or low tunnels; not for livestock or storage.
- Built from a manufactured kit to the maker’s recommendations; frame of metal, wood or durable plastic, at least 6 ft high at the peak.
- A cover with at least a 4-year life; polyethylene at least 6-mil, greenhouse grade and UV-resistant.
- On level ground or a natural slope of no more than 5%; near water for irrigation; runoff led away from the tunnel.
- Where snow may damage it, the cover comes off or rolls up for the winter unless the maker designed the structure for the expected snow; likewise for wind.
It also suggests setting end posts in concrete, 12- to 14-gauge steel and a double layer of plastic for a stronger structure, and placing the tunnel at least twice the height of nearby trees or buildings away from them, to avoid shade.
Through EQIP, NRCS pays no more than 75% of the estimated cost of a practice; historically underserved producers may get a rate at least 25% higher, capped at 90% of the cost (7 CFR 1466.23(b)). The higher rate is allowed, not guaranteed. Your state NRCS office sets the payment for a high tunnel.
What it does not do
- It is not a structural design. A maker’s snow and wind rating, or an engineer’s, is the figure to build to (Purdue: buy a structure engineered for the snow common in your area).
- It gives no wind load for speeds other than UConn’s 80 mph example.
- It prices nothing: steel, plastic and kits change too fast for a fixed table.
- It does not size vents or heat; see the related tools.
Sources
- Bartok, J.W., Jr. Engineering High Tunnels for Better Performance. University of Connecticut. The definition, gothic shape in northern states, minimum tubing, bow spacing, purlins and bracing, ridge posts, the snow and wind loads and the 30 by 72 foot example, posts and anchors, end walls and plastic lengths.
- Cornell University. High Tunnels: Structures. Tunnel types, 12- or 11-gauge arches 4 ft apart, gothic roofs shedding snow.
- Adams, S.A. and K.A. Todd. 2015. High Tunnel Design, Site Development, and Construction. Nebraska Extension EC308. Hoop spacing, sidewall heights, height half the width.
- Trinklein, D. 1 March 2011. Snow Removal From High Tunnels. Missouri Produce Growers Bulletin, University of Missouri. Gothic against Quonset, 4 ft against 6 ft spacing, concrete footings.
- Maden, B., C. Callahan, V. Grubinger and A. Chamberlin. 13 August 2024. A Guide to Preparing High Tunnels for Extreme Weather. University of Vermont Extension, compiled from Vermont Vegetable and Berry Growers Association members’ experience.
- Bruce, A., E. Maynard, J. Farmer and J. Carpenter. August 2018. Indiana High Tunnel Handbook, HO-296-W. Purdue Extension. Caterpillar tunnels, 14-gauge minimum bows, buying for local snow loads.
- Walker, S. (revised). October 2019. Row Cover Vegetable Production Techniques, Guide H-251. New Mexico State University. Low tunnel hoops.
- Fernandez-Salvador, J., E. Chernoh, A. Pheil, K. Poblador and T. Barker. October 2021, reviewed 2025. Low Tunnels for Season Extension in Oregon, EM 9333. Oregon State University Extension.
- USDA Natural Resources Conservation Service. March 2015. Conservation Practice Standard, High Tunnel System, Code 325.
- Code of Federal Regulations, title 7, part 1466, Environmental Quality Incentives Program, §1466.23(b), payment rates (2025 edition).
CC BY 4.0. Cite as "Open Agriculture Technology Hoop House Calculator (openagriculturetechnology.com)".
Frequently asked questions.
How far apart should hoops be on a high tunnel?
No more than 4 feet on center, according to Bartok at UConn. Nebraska Extension finds 4, 5 or 6 feet most common and notes wider spacing needs larger tubing; Missouri finds bows 4 feet apart much stronger than bows 6 feet apart with the same pipe.
How much snow can a high tunnel hold?
It depends on the frame, so build to the maker’s or an engineer’s rating. For scale, UConn puts 3 inches of wet snow or 12 inches of dry at about 5 pounds per square foot, which on a 30 by 72 foot tunnel is about 10,800 pounds. Clear it before it builds up, and choose a gothic roof where snow is heavy.
What size pipe do I need for high tunnel hoops?
UConn’s minimum is 1.90-inch by 14-gauge galvanized tubing for tunnels 26 feet or wider and 1.66-inch by 14-gauge below that, or 2-inch square 16-gauge or 1.625 by 2.750-inch oval tubing at any width. Cornell finds 12- or 11-gauge arches 4 feet apart enough for most New York snow loads.
Is a gothic or Quonset high tunnel better for snow?
For snow, a gothic tunnel: its pointed ridge sheds snow, while a Quonset’s nearly flat ridge is its weakest point under snow (Missouri; Cornell). UConn recommends a gothic shape for northern states, and Vermont growers aim for a 6:12 roof pitch.
How far apart should low tunnel hoops be?
4 to 5 feet (New Mexico State; Oregon State), and 4 feet where snow may fall in spring or fall (Oregon State). New Mexico State uses 9- to 10-gauge wire 48 to 60 inches long; Oregon State uses 6 to 8 foot hoops of conduit, wire or PVC.
Does NRCS pay for high tunnels?
Yes, as conservation practice 325 through EQIP, if the tunnel meets the standard: crops in the natural soil, a manufactured kit at least 6 feet high at the peak, and a cover with at least a 4-year life. EQIP pays no more than 75% of the estimated cost; historically underserved producers may get a rate at least 25% higher, capped at 90% (7 CFR 1466.23). Your state NRCS office sets the actual rate.
Can I grow hydroponically in an NRCS high tunnel?
Not under practice 325. The national standard says crops must be grown in the natural soil profile and the practice does not apply to tables, benches, portable pots or hydroponics; raised beds up to 12 inches deep are allowed.
How do I keep a high tunnel from blowing away?
Drive ground posts 24 to 30 inches deep, brace the four corners, and in windy places add auger or screw anchors about 10 feet apart (UConn). UConn puts the uplift on the roof in an 80 mph wind at about 220 pounds per foot of length. Vermont growers stress strong, well-anchored end walls.