Library · Air, climate & CO₂

Growing Degree Days.

What this is
Calculator
Domain
Air, climate & CO₂
Cost
Free — no account
Use
In the browser, or embed

Growing Degree Days (GDD) Calculator

Plants don't develop on calendar days — they develop on accumulated heat. GDD predicts crop stage and pest emergence from temperature data.

Calculate accumulated GDD

Crop / pest model

Day's temperatures

For estimating accumulation over a stretch
Carry-over since planting

How GDD works

The basic formula:

GDD = ((T_max + T_min) / 2) − T_base

If the average daily temp is 70°F and the crop's base temperature is 50°F, that day gives 20 GDD. After enough days, the crop has accumulated the heat units it needs to flower, set fruit, or mature.

Modifications used in this widget:

  • If T_max exceeds the upper threshold (typically 86°F for warm-season crops), it's capped at the threshold for the average. Heat above ~95°F doesn't accelerate growth — it stresses plants.
  • If T_min is below T_base, it's set to T_base for the average (the "single-sine" simplification).
  • If the resulting GDD is negative, it's set to zero (no growth on cold days).

Why GDD beats calendar days

ScenarioCalendar daysGDD
Sweet corn — typical year~75 days from emergence to silk1400 GDD (base 50°F)
Sweet corn — cool spring85 days1400 GDD
Sweet corn — hot summer65 days1400 GDD

The calendar varies; the GDD doesn't. This is why pest emergence (codling moth, cucumber beetle, etc.) is also tracked in GDD — the bug needs the same heat units regardless of calendar date.

Common GDD thresholds (base/upper temps)

TargetBase (°F)UpperGDD to maturity / event
Sweet corn5086~1400 GDD to silking
Field corn (long season)5086~2700 GDD to physiological maturity
Tomato5095~1300 GDD seed-to-harvest
Pepper5595~1500 GDD
Cucumber5590~600 GDD to first harvest
Snap beans5086~600-700 GDD
Soybean5086~2400-2900 GDD by maturity group
Wheat3290~2200 GDD planting to maturity
Wine grapes (Cabernet)5090~1500-1700 GDD bud-break to veraison
Codling moth (apple)5088First flight ~250 GDD; egg hatch ~430 GDD post-biofix
European corn borer5086First flight ~375 GDD; treatment window ~600-700 GDD

Free under CC BY 4.0. Cite as "OAT Growing Degree Days Calculator (openagriculturetechnology.com)". Crop GDD thresholds from extension publications and field crop literature.